Download pdf (261 KB)
Download pdf (326 KB)
Download pdf (792 KB)
Download pdf (4.6 MB)
Download pdf (757 KB)
When Ulteig was enlisted to lead the SCADA integration at the Hillcrest Solar Project in Ohio, they were also tasked with developing a flood monitoring system to help anticipate rising water levels and mitigate any potential damage to the plant. The company approached NRG Systems about creating a system that could be integrated into the plant’s SCADA platform.
Download pdf (292 KB)
In 2017, the Vietnamese government issued a requirement that to obtain a commercial operation permit, solar plants producing 30 MW or higher must have a met station on-site, to ensure accurate measurement of available energy. VREE teamed up with Digi Technologies to create a monitoring solution to satisfy this requirement.
Download pdf (195 KB)
NRG is well-versed in navigating global projects, but when COVID-19 brought the world to a halt in March 2020, unforeseen challenges with travel, training, and installation emerged.
Download pdf (203 KB)