Skip to navigation Skip to content
Instruction Sheets

Installing and Wiring LOGR-S UPS + PV Shelter Boxes and Auxiliary Battery Kits

Download pdf (1.4 MB)

These instructions explain how to install and configure UPS+PV-Shelter Boxes #16928 and #16929. These power supplies provide the MET Station with constant 12 VDC or 12V + 24 VDC (respectively) to keep the installed equipment operating continuously. Both the AC grid power and PV inputs are connected to a charging regulator that keeps the auxiliary battery(ies) topped off and ready to use in the event of a grid outage at the site.

Download Calibration Reports

Our Calibration Report Retriever Tool is a comprehensive database of reports for the following products:

NRG Anemometers
110S Temperature Sensor
200M Wind Vane
200P Wind Vane
BP20 Barometric Pressure Sensor
BP60 + BP60C Barometric Pressure Sensor
HybridMC Anemometer + Vane
HybridXT Anemometer + Vane
PVT1 PV Temperature Sensor
T60 + T60C Temperature Sensor
R1 Pyranometer
RH5X Relative Humidity Sensor
Thies First Class Advanced Anemometer
WindSensor P2546-OPR Anemometer

Tech Support

Whether you are troubleshooting in the field or learning how to install a product, we are here for you.